Curtain Wall Installation Sequence
Aluminum brackets will be fixed on the concrete or hollow block by using applicable anchor bolts as per the drawing.
Curtain wall installation sequence. To install fire insulation according to approved shop drawing at top part of concrete beam surface prior to curtain wall installation. Curtain wall units are then hoisted up from the loading platform by means of this monorail and electric chain block and place in position at floor edge for fixing to the pre installed anchor brackets. United states aluminum series 4500 curtain wall installation instructions page 5 d5 the series 4500 curtain wall systems are designed for shear block stick erected and screw spline panel erected type assembly methods the shear block method of assembly is recommended for multi floor applications where mullions will be spliced. If the unit has a corner start at the corner.
3 each cassette type has its own sequence of pages for size determination to installation phase. Curtain walls generally fall into two basic categories that are based on their method of fabrication and installation. Install slide n pivot jamb anchor after cassette frame assembly. The installation duration for each floor is tied to the embed anchor installation and concrete pour.
Make sure the distance between the line and the outside wall is consistent on both sides. Available in a variety of depths profiles finishes and unitized options our relatively lightweight weathertight curtain wall systems provide a cutting edge combination of design and performance including thermal hurricane and blast resistance. Frame installation begins at the base of the façade wrapping each floor level with a pre determined installation sequence. These are unitized or modular systems figure 9 2a b and stick systems figure 9 3a b in the stick system the curtain wall frame mullions and glazing panels are installed and connected together piece by piece.
For aluminum cladding adjoining the glazed curtain wall the same procedure for survey and leveling has to be followed before installation. 4 cassette frames can be installed in vertical runs horizontal runs or shingled. Stick wall installation sequence establish control lines. 2 field verify dlo of installed curtain wall prior to cassette frame machining and assembly.
By no means is this the only technique of assembling a wall but this section covers the steps necessary to install a stick wall and a unitized wall. Step 1 5 step 1 6 1 preparation 5 curtain wall. Curtain wall to the other end of the rough opening. What follows is a generalization of the procedures involved with erecting a curtain wall system.